In this event, through (upper) truss bridge and suspension bridge is to be constructed using Pop sticks (ice cream sticks) satisfying the stated constraints. The event consists of three rounds
This include preparation of pile on different soils with different loads on it. Participants have to make a model of pile with pile cap.
In this event you have to build a ‘Crane’ which can pick the dead weight and move from one place to another place through the allocated track.
Students will have to convert 3D home drawing into 2D floor plan.
Participants will have to form a structure using wooden blocks.